Every image in this gallery represents a completed industrial gas decommissioning project executed under full regulatory compliance — NFPA, EPA, OSHA, and DOT. No renderings. No stock photography. Every photo was taken on-site by our field crews.
From 150,000-gallon LNG vessel extractions requiring 320-ton crawler cranes, to multi-point LOTO sequences on high-pressure CNG arrays, these projects represent the breadth of hazardous infrastructure we routinely engineer and remove safely.

Cryogenic Tank — N₂/O₂
Cryogenic System Removal
Vacuum Jacket Extraction
All Projects
Browse the
Gallery

LNG Tank — 150,000 Gal
LNG Storage Removal
Heavy Lift · Cryogenic Purge

N₂ Inert Purge System
Nitrogen Purging Rig
Thermal Shock Prevention

CNG Array Teardown
CNG Station Dismantling
High-Pressure Disconnection

Diamond Wire Saw
Cold-Cutting Operation
Zero-Spark Cutting Protocol

SPMT Trailer · DOT Oversize
Heavy Transport
150,000-Gal Vessel Transit

Lockout/Tagout Protocol
LOTO Execution
Zero-Kinetic-Energy Verification

Cryogenic Tank — N₂/O₂
Cryogenic System Removal
Vacuum Jacket Extraction

Compressor Station Teardown
Compressor Skid Removal
40-Ton Skid Haul-Away

Post-Removal Site Work
Site Remediation
Soil Sampling · EPA Closure

Structural Frame Removal
Structural Demolition
Cold-Cut Segment-By-Segment

Crane Coordination
Tank Transport Coordination
Highway Manifesting

LOX Vessel Decom
Oxygen Tank Removal
Oxidizer Purge · Nitrogen Inert
Signature Project
Heavy Lift
Showcase

320-Ton Crawler Crane · SPMT Trailer · DOT Oversize
150,000-Gallon LNG Vessel
Complete Extraction & Transport
Zero-incident completion · NFPA 59A compliance
Next Step
Ready to
Sequence Yours?
Our heavy logistics and compliance managers are ready to assess your facility layout, identify cost-offset opportunities, and deliver a fixed-scope proposal.