Industrial Gas Tank

Safe & Compliant
Tank Removal

WE REMOVE HAZARDOUS AND NON-HAZARDOUS INDUSTRIAL GAS SYSTEMS — SAFELY, ON SCHEDULE, AND IN FULL COMPLIANCE WITH EPA, OSHA, AND DOT RULES.

Process overview

Removal Process
Optimization

ULTRA-MODERN DECOMMISSIONING SPANNING

Your Specialized Decommissioning Partner

Rules are getting tighter. Sites are aging. More companies need to take old gas tanks and piping out of service — fast, safely, and without shutting down the rest of the plant. That is exactly what we do. Energy firms, factories, and plant owners trust us to plan and run their hardest gas equipment removal projects.

Across the country, site managers are pulling out old LNG, CNG, and cryogenic tanks to cut risk and bring their plants up to date. They need work done right — with zero downtime for the systems still running next door. We handle every step: permits, safety plans, the physical tear-down, and asset recovery. Your site gets cleared on time, on budget, and fully closed out with all the right paperwork.

We work with you side by side — finding site hazards, sorting out permits, and doing the hands-on removal work. Whether your goal is less downtime, higher resale value on your old vessels, or a clean safety record, we plan it, we do it, and we close it out.

100%

EPA Compliant

Fully adheres to environmental standards.

0.0

Incident Rate

Perfect safety record over 10 years of service.

500+

Tanks Removed

Safely decommissioned across various facilities.

Operational Scopes

Every job is scoped to match the size and risk level of your site. Pick the tier that fits — from a single tank pull to a full plant tear-down.

01
Targeted Extraction

Single-Asset Removal

One tank, one crew, one clean outcome. Best for standalone vessels that are easy to reach and free of hazmat concerns.

+Site & Structural Assessment
+Residual Gas Venting & Purging
+Standard Rigging & Logistics
02
Plant-Wide Decommissioning

Complex Facility

Multiple tanks, piping runs, vaporizers, and manifolds — all torn down in a staged plan that keeps the rest of your plant online.

+Piping & Manifold Demolition
+Confined Space Protocol Management
+Sequential Outage Dismantling
03
Hazardous Systems

Regulatory Remediation

Toxic, reactive, or badly worn-out tanks that need full hazmat controls before anyone picks up a wrench.

+Chemical Line Neutralization
+Strict EPA Hazmat Permitting
+Soil & Foundation Pad Integrity Testing

Proven Track Record

Why Facilities Choose Us

Taking out gas tanks is not standard demo work. Our crews know cryogenic systems, high-pressure vessels, and hazmat protocols inside and out. And our safety and permit records hold up under the toughest OSHA, EPA, and DOT audits.

OSHA, EPA & DOT Compliant

Every job has a written safety plan tied to 29 CFR 1910, 40 CFR 68, and 49 CFR 171-180. We file the permits, send the notices, and close out the paperwork — so your site stays clean from first cut to final sign-off.

HAZWOPER-Certified Crews

Our field teams hold 40-hour HAZWOPER cards, confined space permits, and cryogenic safety training. They are cleared to work with ammonia, chlorine, LNG, and other regulated gases — on both active plants and shut-down sites.

Asset Recovery & Resale

Tanks, vaporizers, and piping that still have useful life get priced for resale. Many clients save 20-40% on removal costs by selling used gear through our broker network.

Minimal Downtime

We plan around your production schedule. Staged tear-downs keep nearby systems running. Gear is pre-staged on site so the crew hits the ground fast — shorter timelines, less disruption.

Recent Decommissions

From single-vessel extractions to multi-phase plant closures, every project below was completed on schedule with zero safety incidents and full regulatory closure.

Tank lifting operation

Cryogenic Plant Dismantling

Successfully removed three 10,000-gallon LOX tanks from an active manufacturing facility without interrupting adjacent operations.

Remediated site

Ammonia Facility Remediation

Hazardous material protocol executed perfectly. Site was cleared, tested, and returned to client for new development.